05/08/08 -  Ramp to garage ‘leveled’ and smooth(er)...

05/08/08 -  Hole beside garge for rain water harvesting tanks (4 off - 1000l each)...

05/08/08 -  Behind the house, manky apple tree gone, leveled off a bit...

05/08/08 -  Filling in the last of the original house excavation...

05/08/08 -  Digging the foundation trench...

05/08/08 -  Mark out the new retaining wall foundation...

05/08/08 -  Digger’s back to start the landscaping, propper.  Take out the old fence by the road...

[Wychwood] [Progress Pictures] [Caravan Instalation] [Demolition] [Excavation] [The Build - Foundation] [The Build - Grnd Floor] [The Build - 1st Floor] [Guided Tour Videos] [The Oak Frame] [The 'Wings' Roofs] [The Main Roof] [Second Fix] [Caravan Out] [Cladding] [Fire Place & Chimney] [Drains] [New Garage] [UFH] [Landscaping] [Ground Floor] [Model Pictures] [Plans] [General Plot Pics] [The Old Caravan] [RSW's Photos] [EV Conversion] [Links]

29/08/08 -  Wall footings rebared and ready for concrete.  Looking North.  This will have a brick and concrete block retianing wall on it.  Further up it changes to brick and brick, non-retaining...