17/05/05 - Break up those foundations...
17/05/05 - That is a BIG truck... (24 loads to clear it all)...
03/06/05 - The hole ready for re-bar installation...
29/08/08 - Wall footings rebared and ready for concrete. Looking North. This will have a brick and concrete block retianing wall on it. Further up it changes to brick and brick, non-retaining...
|