07/06/07- Pumping station sump constructed awaiting GRP lining, a lid and 1.5m tall access way.
02/06/07- Front rain-water sump cast. The formwork will have to rot in situ.
29/08/08 - Wall footings rebared and ready for concrete. Looking North. This will have a brick and concrete block retianing wall on it. Further up it changes to brick and brick, non-retaining...