07/06/07- Pumping station sump constructed awaiting GRP lining, a lid and 1.5m tall access way.

02/06/07- Front rain-water sump cast.  The formwork will have to rot in situ.

[Wychwood] [Progress Pictures] [Caravan Instalation] [Demolition] [Excavation] [The Build - Foundation] [The Build - Grnd Floor] [The Build - 1st Floor] [Guided Tour Videos] [The Oak Frame] [The 'Wings' Roofs] [The Main Roof] [Second Fix] [Caravan Out] [Cladding] [Fire Place & Chimney] [Drains] [New Garage] [UFH] [Landscaping] [Ground Floor] [Model Pictures] [Plans] [General Plot Pics] [The Old Caravan] [RSW's Photos] [EV Conversion] [Links]

29/08/08 -  Wall footings rebared and ready for concrete.  Looking North.  This will have a brick and concrete block retianing wall on it.  Further up it changes to brick and brick, non-retaining...