>>
>>
> >
>BuiltWithNOF>

Pics of the demolition in chronological order...

10/03/05

16/03/05

16/03/05

31/03/05

31/03/05

08/04/05

10/04/05

19/04/05

23/04/05

02/05/05

Watch the end of the old house.19/04/05 (1.9Mb)

Right Click and Play

(Flashplayer required)

The crusher in action...

[Wychwood] [Progress Pictures] [Caravan Instalation] [Demolition] [Excavation] [The Build - Foundation] [The Build - Grnd Floor] [The Build - 1st Floor] [Guided Tour Videos] [The Oak Frame] [The 'Wings' Roofs] [The Main Roof] [Second Fix] [Caravan Out] [Cladding] [Fire Place & Chimney] [Drains] [New Garage] [UFH] [Landscaping] [Ground Floor] [Model Pictures] [Plans] [General Plot Pics] [The Old Caravan] [RSW's Photos] [EV Conversion] [Links]

29/08/08 -  Wall footings rebared and ready for concrete.  Looking North.  This will have a brick and concrete block retianing wall on it.  Further up it changes to brick and brick, non-retaining...