1. The caravan arrives 1000 hrs - 07/02/05.

2. It’s hauled up the 1:10 slope with two Landys and their winches.

3. Pivoted around into its corner position (using a tree as an anchor).

4. 1800 hrs - In position and up on chocks, level.

http://www.macromedia.com/shockwave/download/download.cgi?P1_Prod_Version=ShockwaveFlash

A short movie  2.4Mb

(Flashplayer required)

Right Click and Play

[Wychwood] [Progress Pictures] [Caravan Instalation] [Demolition] [Excavation] [The Build - Foundation] [The Build - Grnd Floor] [The Build - 1st Floor] [Guided Tour Videos] [The Oak Frame] [The 'Wings' Roofs] [The Main Roof] [Second Fix] [Caravan Out] [Cladding] [Fire Place & Chimney] [Drains] [New Garage] [UFH] [Landscaping] [Ground Floor] [Model Pictures] [Plans] [General Plot Pics] [The Old Caravan] [RSW's Photos] [EV Conversion] [Links]

29/08/08 -  Wall footings rebared and ready for concrete.  Looking North.  This will have a brick and concrete block retianing wall on it.  Further up it changes to brick and brick, non-retaining...